National Geographic - Malaysia Smart Tunnel Urban Diggers National Geographic Documentary HD
Thanks for Watching. Don't like and comment. Thanks ;)
National Geographic Megastructures Smart Tunnel construction in Kuala Lumpur, Malaysia
E38 SMART Motorway Tunnel in Kuala Lumpur (13 Oct 2016)
The Stormwater Management And Road Tunnel (SMART Tunnel), E38, is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. The 9.7 km (6.0 mi) tunnel is the longest stormwater tunnel in South East Asia and second longest in Asia.
The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams along Jalan Sungai Besi and Loke Yew flyover at Pudu during rush hour. There are two components of this tunnel, the stormwater tunnel and motorway tunnel. It is the longest multi-purpose tunnel in the world.
In 2011, the SMART tunnel received the UN Habitat Scroll of Honour Award for its innovative and unique management of storm water and peak hour traffic.
It begins at Kampung Berembang lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South. The project is led by the government, including Malaysian Highway Authority (Lembaga Lebuhraya Malaysia, LLM) and the Department of Irrigation and Drainage Malaysia (Jabatan Pengairan dan Saliran, JPS) and also a company joint venture pact between Gamuda Berhad and Malaysian Mining Corporation Berhad (MMC).
Ref:
Megastructures - Smart Tunnel Kuala Lumpur Documentary National Geographic
Kuala Lumpur Mega SMART Tunnel - Classic Documentary
Kuala Lumpur Mega SMART Tunnel - Classic Documentary
The Stormwater Management And Road Tunnel (SMART Tunnel), E38, is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. The 9.7 km (6.0 mi) tunnel is the longest stormwater tunnel in South East Asia and second longest in Asia.
Read More:
Subscribe to our Channel:
How SMART Tunnel work
The Storm water Management And Road Tunnel (SMART Tunnel) is the longest multi-purpose tunnel in the world that located at Kuala Lumpur, Malaysia. There are two main components of this tunnel, the storm water tunnel and motorway tunnel with different function.
Thank you for watching.
The Stormwater Management and Road Tunnel (SMART Tunnel)
How do we make cities smarter? During Monsoon season in Kuala Lumpur they suffer from heavy flooding and they also have to deal with heavy congestion on one of the one of the main roads on a daily basis. To combat this they built a dual purpose tunnel.
To learn more about the SMART Tunnel click here:
SMART Tunnel
The Stormwater Management And Road Tunnel or SMART Tunnel, E38 is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country. The 9.7 km (6.0 mi) tunnel is the longest stormwater tunnel in South East Asia and second longest in Asia.
Terowongan Smart Tunnel Kuala Lumpur
Terowongan ini di buat oleh pemerintah malaysia untuk menghindari Banjir di Kota Kuala Lumpur dan sekitarnya, sekaligus sebagai fungsi Tol Road.
SMART Tunnel, Kuala Lumpur, Malaysia
Smart Tunnel Kuala Lumpur
SMARTunnel is an acronym for Stormwater Management and Road Tunnel, a project to alleviate the flooding (of water and traffics) problem in the city centre of Kuala Lumpur
Read More:
Watch also National Geo Video:
Malaysia - Using Smart Tunnel to Times Square Shopping Mall
This 10 minutes video shows you how to go to Times Square Shopping Mall y using Smart tunnel in Kuala Lumpur.
Terowongan terpanjang Malaysia trip in #SMART Tunnel#smart tag
Renovation with greenlight tanda pintu kecemasan
The SMART Tunnel Southbound
Driving through the SMART Tunnel in Kuala Lumpur
More videos & info at:
Smart Tunnel Kuala Lumpur Malaysia
Farhad Ali, Ismail Sparly, Shah farvaiz and Gulab jan traveling to smart tunnel underground highway Kuala Lumpur Malaysia.
Bandar Kinrara, Smart Tunnel, Heart Institute KL, Exchange 106 & PJ , 5 Jul 2018
Selangor, 4 July to 7 July 2018
Playlist:
-----------------------------------------------------------------------------------
Instagram:
Twitter:
Facebook :
Support Gerryko Malaysia by contributing 1 US Dollar a month through Patreon:
Wish to Donate to Gerryko Malaysia via Paypal? :
-----------------------------------------------------------------------------------
-----------------------------------------------------------------------------------
Location:
-----------------------------------------------------------------------------------
-----------------------------------------------------------------------------------
For business inquiries, sponsorship & advertising in my videos: Find me on FB,
My Other Channels:
1.Gerryko Malaysia Media Events & Food
2.Gerryko Malaysia TV Anime & Vlogs
-----------------------------------------------------------------------------------
Gerryko Malaysia Media Events & Food, Gerryko Malaysia, Gerryko Malaysia TV Anime & Vlogs, vlogs,
street food, food, food review
#GerrykoMalaysia
0:10, 6:00, 12:00, 18:00, 24:00, 30:00, 36:00, 42:00, 48:00, 54:00, 1:00:00, 1:06:00, 1:12:00, 1:18:00, 1:24:00, 1:30:00, 1:36:00, 1:42:00, 1:48:00, 1:54:00, 2:00:00, 2:06:00, 2:12:00, 2:18:00, 2:24:00, 2:30:00, 2:36:00, 2:42:00, 2:48:00, 2:54:00, 3:00:00
-----------------------------------------------------------------------------------
Food Hunt
Playlist:
Gundam Hunt
Playlist:
SMART Tunnel, Kuala Lumpur
Heading south on the KL Stormwater Management And Road Tunnel. Entering from Jalan Imbi, heading to Sungai Besi highway to exit to Petaling Jaya. Notice water entry gates on left at 1:35 and water exit gates on right at 3:25. Toll: RM2.00
SR 99 'Smart' Tunnel
WSDOT video
Trip in Smart Tunnel KL
Trip into the Smart Tunnel in Kuala Lumpur Malaysia - ilen kardani sisodin
Lumpur Di Hujung Terowong Smart Tunnel
Operasi pembersihan Terowong SMART yang dilakukan oleh petugas-petugas yang dipertanggungjawabkan membersihkan terowong SMART selepas banjir mulai surut di sekitar Lembah Klang dan Kuala Lumpur.
SMART Tunnel Gate Closure Procedure
From closing the entry points to checking the emergency exits, have a look at the routine procedure taken when a major storm is on the way and the SMART Tunnel has to close.